• HOME
  • ABOUT
  • LATEST NEWS
  • DESIGN/BUILD
  • PRODUCTS
  • SERVICES
  • PROJECT LIBRARY
  • CAREERS
  • TURF SANITIZE
  • CONTACT US
Content Page Header
Hellas Construction, Inc.
  • ABOUT
    • Why Hellas
    • Safety
    • History
    • Philosophy
    • Memberships & Partners
    • Latest News
    • Testimonials
    • Careers
  • |
  • Latest News
  • |
  • DESIGN/BUILD
    • Delivery Methods
    • Project Showcases
  • |
  • PRODUCTS
    • Turf
    • Track
    • Tennis
    • Sod
    • Lighting
  • Hellas Sports Construction
  • SERVICES
    • Sports Construction
    • Manufacturing
    • Facilities & Essentials
    • Field Installation
    • Track Installation
    • Post-Tension
    • Court Installation
    • Service & Maintenance
    • Turf Sanitize
  • |
  • PROJECT LIBRARY
  • |
  • CONTACT US

About Hellas

Home    »    About    »    Latest News
1-800-233-5714
info@hellasconstruction.com

About

  • Why Hellas
  • History
  • Philosophy
  • Memberships & Partners
  • Latest News
  • Testimonials
  • Careers

Mesquite Schools Stay On Track With Hellas Construction

July 14, 2017





Hellas installed an epiQ Tracks® S200 track system installed at Terry Middle School in 2016.
Hellas installed an epiQ Tracks® S200 track system installed at Terry Middle School in 2016.

Austin, TX (July 14, 2017) – Mesquite Independent School District is once again using Hellas Construction for its quality and construction to install new running tracks at Kimbrough and McDonald middle schools this summer. Hellas crews are hard at work completely removing the old tracks that date back to when each school was first built.

Steve Bragg, Mesquite ISD Athletic Director since 2007 said, “I always enjoy working with Hellas. They are truly a one stop shop and you always know what you are getting.”

Both Kimbrough Middle School and McDonald Middle School are having their tracks torn out and completely rebuilt from the subbase. “They both had the old cinder tracks that had never been done before,” said Bragg. “The cinder tracks just aren’t as durable or reliable as the asphalt-based tracks.”

Bragg said he has used Hellas for 13 different campuses throughout the school district. “The quality and construction is always first rate and their products hold up. You can’t go wrong with Hellas,” Bragg said.

Mesquite ISD selected the epiQ Tracks® S200 track system, a paved-in-place system made from Hellas’ own eco-friendly, non-petroleum based materials and suitable for any facility. Both middle schools will be black S200 track systems, ready just in time for the beginning of school in August.

Product Links
epiQ Tracks® s200
Track Systems

###


CONTACT HELLAS
Quick Links
  • HOME
  • ABOUT
  • DESIGN/BUILD
  • PRODUCTS
  • SERVICES
  • PROJECT LIBRARY
  • LATEST NEWS
  • PRODUCT SITES
Social Media

© 2024 Hellas Construction.

  • Latest News
  • Career
  • Site map
  • Product Sites
Menu