• HOME
  • ABOUT
  • LATEST NEWS
  • DESIGN/BUILD
  • PRODUCTS
  • SERVICES
  • PROJECT LIBRARY
  • CAREERS
  • TURF SANITIZE
  • CONTACT US
Content Page Header
Hellas Construction, Inc.
  • ABOUT
    • Why Hellas
    • Safety
    • History
    • Philosophy
    • Memberships & Partners
    • Latest News
    • Testimonials
    • Careers
  • |
  • Latest News
  • |
  • DESIGN/BUILD
    • Delivery Methods
    • Project Showcases
  • |
  • PRODUCTS
    • Turf
    • Track
    • Tennis
    • Sod
    • Lighting
  • Hellas Sports Construction
  • SERVICES
    • Sports Construction
    • Manufacturing
    • Facilities & Essentials
    • Field Installation
    • Track Installation
    • Post-Tension
    • Court Installation
    • Service & Maintenance
    • Turf Sanitize
  • |
  • PROJECT LIBRARY
  • |
  • CONTACT US

Design/Build

Home    »    Design/Build    »    Project Showcases    »    Cameron ISD
1-800-233-5714
info@hellasconstruction.com
Design/Build
  • Delivery Methods
  • Project Showcases
    • Jourdanton ISD
    • Anna ISD
    • Van Horn Eagles
    • Beeville ISD
    • Cameron ISD
    • Garden City CC
    • Gruver ISD


Cameron Independent School District Design/Build –
Cameron, TX

Hellas’ Matrix® Turf system was installed in the summer of 2014. Cameron ISD’s school board approved the project in May 2014. Construction for the first phase of the stadium was finalized in September.

In addition to turf, Hellas also installed its epiQ TRACKS® system, as well as the visitor’s grandstands. Hellas is also responsible for the second phase of the project, which includes new home grandstands to match the visitors’ side, as well as a tennis complex, and an A.D.A. approved entrance to the stadium.

The $2.9 M overall renovation project includes:
  • Visitor Grandstands (Phase 1)
  • Home Grandstands (Phase 2)
  • Stadium Field
  • Parking Lot (separate site)
  • ADA Compliant Entrance
  • Track Re-construction (epiQ TRACKS Q3000) & Press Box (separate site)
  • Tennis Courts (separate site)
  • Jogging Trail Walkway (separate site)

Color rendering of the Cameron Yoe Yoemen football field



Early morning concrete pour



Base structure for grandstands



Grandstands assembly



Number installation at the Cameron Yoe Yoemen football field



Finished grandstands and band practice



Cameron Yoe Yoemen football field



Finished epiQ TRACKS Q3000


“It’s pretty impressive to pass a bid in May and be able to play your first game in such a short time span,” said Cameron ISD’s Superintendent Colin Clark. “For the average worker on the job, to the superintendent of the project and the President of Hellas, there is a great sense of pride for the quality of work that they provide.”



CONTACT HELLAS
Quick Links
  • HOME
  • ABOUT
  • DESIGN/BUILD
  • PRODUCTS
  • SERVICES
  • PROJECT LIBRARY
  • LATEST NEWS
  • PRODUCT SITES
Social Media

© 2024 Hellas Construction.

  • Latest News
  • Career
  • Site map
  • Product Sites
Menu